House renovation and new build in Greenlane

       673m2 total land area with existing two-bedroom 80m2 character cottage

The owner planned to demolish the cottage and build two new three- and four-bedroom houses. We ran a detailed feasibility study and concluded that a more effective strategy would be to fully renovate the existing house and add a third bedroom, and build one new four-bedroom house at the back. This option was more profitable and involved far less work and capital investment. Smarter upfront thinking meant multiple wins for our client.